Friday, July 20, 2012

Nearing The Completion and Dedication

This week I have no new photographs. The sprinkler system has been tested this week along with installation of additional irrigation pipe. The inside of the church has many small details that are being completed, including touching up of paint, and lighting in rooms. The septic system is being tested as are electrical systems that run the AC and Heat.


Once the outside landscaping is complete and the detailing of projects within the building is done, it will be turned over to the church. As I understand it, the area facilities people will then put various paintings of the Savior in the building, add the materials to the library and do any additional work in preparation for the open house and dedication.


If I am allowed to, I will try and get photographs of the interior and exterior of the building up on this blog before the actual open house.

Open House: September 14th and 15th*
*Contact Paul and Afton Currit for more information 782-1340

Dedication: September 16th at 6:30

Wednesday, July 11, 2012

Moving Ahead

Today at 1:00 pm. Chapel has all scaffolding down and stucco work is completed. Vents on west end of the building have finally arrived and have been installed. The parking lot has been paint striped for parking, including marking of handicapped spots. Landscaping and irrigation are still on-going.


Open House
September 14th and 15th

Dedication
September 16th at 6:30 PM.

Scaffolding is down. 

Stucco work is complete

Parking slots have been painted including designated handicapped parking.

Entrance is beautiful

All vents have been installed.

Installing additional irrigation pipelines

More parking

Friday, July 6, 2012

More Finishing Touches

It has been over a week since the last photos. Lamp posts are installed. The parking area has been completely paved. Stucco work is continuing on the chapel. The organ has been installed. Yet to come: painting the parking spots, landscaping and all of the small details inside of the building.


Lamp Posts are installed

Stucco is still being applied on the front and  above entrances to the building.




Pews are all installed

Beautiful new organ





No more staring at the wall


THERE IS NO BAPTISMAL FONT in the building so this was funny to me. I believe this office will be Bishop Webb's of the Wenatchee River Ward.