Tuesday, March 27, 2012

Work on the interior of the building


 Today I went past the chapel on Easy Street and things looked very much the same on the exterior. Once I put my hard hat on and entered the building it was evident that much has been going on. One has to look at the magnitude of effort here in order to see the changes that have taken place since the last photographs of the interior. Miles of wiring all over the building as well as more HVAC everywhere. Some of these photos have titles, most are just self explanatory. Enjoy!


This is the north entrance to the building.
Installing materials.


Pulling wiring in the Chapel 




















































Be happy in your work!

Friday, March 23, 2012

Outside of the Chapel on a Sunny Day!

Drove past the church about 12:30 today and took these photos of the outside. The doors were locked as no crew were working. Good safety measure, to be sure. I will try to get there next week during the operational day and then add some more photographs. Below is view of East End of the chapel.


  
Below is the view from the West End of the Chapel after the brickwork has been done. The silver/blue openings are HVAC for cooling and heating.






Additional brickwork being completed on the south side of the building.




The septic tanks have been buried and these are the access ports for draining when needed. I assume they will be buried and fairly level with the ground when the landscaping is done. 




More of the brick work.




It is really starting to look great!




Nobody is getting in here!





Saturday, March 10, 2012

Saturday is a special day, its the day to get ready for Sunday

  Drove past the site today...no work going on, but wanted to get some outside photos up on the the blog. Things are moving along!





Thursday, March 8, 2012

Continued Brickwork on the west end of the chapel

There is lots of brickwork yet to be done. Here is what is happening right now.




Working inside the chapel.

Additional  work is taking place with plumbing, sprinkler systems in the rooms and electrical. Here are some more photographs of things happening inside the building.






Looking down the hallways.

Here is a view down the hallways on each side of the building.


Inside the building...LOTS of sheetrock!

Thought everyone might like to see what is happening inside the building since the last photos. There are many things going on, but like most things they do not catch your eye particularly at first. One of the main things going on is putting up sheetrock.