Friday, March 23, 2012

Outside of the Chapel on a Sunny Day!

Drove past the church about 12:30 today and took these photos of the outside. The doors were locked as no crew were working. Good safety measure, to be sure. I will try to get there next week during the operational day and then add some more photographs. Below is view of East End of the chapel.


  
Below is the view from the West End of the Chapel after the brickwork has been done. The silver/blue openings are HVAC for cooling and heating.






Additional brickwork being completed on the south side of the building.




The septic tanks have been buried and these are the access ports for draining when needed. I assume they will be buried and fairly level with the ground when the landscaping is done. 




More of the brick work.




It is really starting to look great!




Nobody is getting in here!





No comments:

Post a Comment